Freeport McMoran Mine Maintenance Building

…drill rig weighs 185,000 pounds and required design attention to slab settlement and underground utilities with vertical and horizontal expansion fittings. The project consists of grading approximately three acres, sanitary…

Rock River Water Treatment Plant

…system, three turbidity meters and one UV254 analyzer, upgrades to the existing PLC/SCADA controls system, replacement of existing membrane modules with new Siemens/Memcor M10C membrane modules; and air compressor replacement….

GCI AU-Aleutian

…the Marine Mammal Protection Act, National Historic Preservation Act, and Endangered Species Act. Additionally, DOWL assisted with obtaining necessary land use authorizations, easements, and rights-of-way. Link to GCI page: https://www.gci.com/aleutianfiberproject…