Showing Results For

North 27th Street Stormwater Master plan

…was comprised of mainly commercial and residential development. DOWL completed field evaluations, site survey of key facilities, and developed multiple rain simulation models for both existing conditions and proposed alternatives….

Washington County Fairgrounds Master Plan

…City of Hillsboro, new projects within the county’s fairgrounds zoning designation, Station Community Fair Complex Institutional, first required city approval of a master plan through a PUD process. DOWL successfully…

City of Reno Sewer and Street Rehabilitation

DOWL completed the design and construction management for the roadway rehabilitation of neighborhood streets in central Reno including Stewart Street, Taylor Street, Gould Street, and Dayton Way. The street rehabilitation…

Johnson County Airport Master Plan

The Johnson County Airport Master Plan was a comprehensive 20-year planning study that examined all facets of this rural and historic community airport in Northern Wyoming. The project examined the…

Shiloh Conservation Area

The west end of Billings, Montana is rapidly transitioning from agriculture to residential and commercial developments. This urban development has the potential to increase and accelerate runoff and flush pollutants…

Brookings Harbor Tsunami Repairs

DOWL assisted the Port of Brookings Harbor in executing the Port’s $7 million tsunami recovery program following the March 2011 Japanese earthquake. The resulting tsunami caused the Port’s commercial receiving…

8th Street Bridge Replacement

…project site adjacent to residential areas A significant and comprehensive public outreach program to engage the community throughout project development Adjustments for challenging weather that limited scheduling of construction activities…

Tahoe Keys Emergency Generator

…permitting, and Liberty Energy utility requirements. Until this project was constructed, the Tahoe Keys community relied on a mobile generator, which required the electric utility company to deliver and connect…

Vee Quiva Casino and Resort

…design handled the significant amount of drainage coming toward the site from South Mountain. Design of water and sewer extensions included approximately 9,356 lineal feet of 12-inch PVC C-905 water…