Showing Results For

Montana Capitol Campus ADA Improvements

…features including sidewalk cross slope, curb ramps, and cross walks. DOWL provided the state with a geographic information system database and visual heat maps indicating the areas of highest Americans…

Oregon City Arch Bridge Rehabilitation

…in 1922, it serves as a vital transportation route for Highway 43. Though the 755-foot-long bridge appears to be a concrete structure, it is actually made of structural steel covered…

Bogard Road

…patterns at three schools, various retaining walls, new frontage roads, preparing the subsurface for future widening, and two pedestrian underpasses. Construction was completed in two phases over three construction seasons….

Vee Quiva Casino and Resort

DOWL provided civil engineering site improvements for the development of a new casino and 90-room hotel with parking garage. The scope of work included design of grading and drainage improvements…

Cedar Hills Crossing

Cedar Hills Crossing is a large retail commercial center located in Beaverton, Oregon. The center totals over 55 acres of commercial space including grocery anchors, retail shops, restaurants, fitness center,…

Goat Blocks Development

The Goat Blocks project is a multi-block, mixed-use development in Portland’s vibrant inner southeast core. DOWL team members led the civil design and permitting from concept to completion for this…

The Cove Garden Apartments

…42-inch storm main and a 10-inch water main. DOWL’s permitting and design services on this complex project included FEMA floodplain fill authorizations, significant mass grading, city public infrastructure design, stormwater…

Washoe County Safe Campus

In May of 2021, DOWL was contracted by Washoe County to design a safe camping location for unhoused people, to be built at Governor’s Bowl adjacent to the recently built…