Showing Results For

Civil and Land Development

…only up-to-date on national design standards, they also have the local expertise and experience necessary to provide practical solutions that are effective in the communities where we live, work, and

Tippet Rise Arts Center

…arts and music center located in the Beartooth Mountains on a 10,260-acre working ranch. DOWL completed engineering services in support of the music hall, residences, guest housing, and dining hall….

Conway Master Plan Development

…a combination sewer line and franchise utilities for the multi-story parking garage excavation. DOWL team members also designed the public improvements and stormwater management facilities, and collaborated with the design…

Judith River Trestle

…towers, eight drilled concrete pier foundations, and repair of tower foundations that were undermined by scour. To complete these elements, DOWL performed surveying, basin hydrology and river hydraulics, geotechnical investigation…

Mesa Fire Station

DOWL completed the site design of a new three-bay, 12,339-square-foot fire station in the City of Mesa, Arizona. LEED sustainable concepts and principles were incorporated into the new building to…

Oregon City Arch Bridge Rehabilitation

…protective coatings in poor condition. DOWL completed an extensive structural rehabilitation for the bridge that involved removing and replacing all deteriorated or damaged steel and concrete as well as seismic…

Mt. Pisgah Gardens

and then helped to finalize a contract with the construction contractor. During construction, overall project management and construction administration was provided. The project was completed under budget and on schedule….

BG Food Cartel

…with indoor/outdoor seating. The site can host events for up to 150 people in a clean, comfortable environment. The DOWL team developed designs for the site layout and grading, pedestrian…

Park the Carts – Food Cart Pod

This project for NJP Property, funded in part by Prosper Portland, the City of Portland’s community development corporation, involved development of schematic and final designs for an approximately half-acre food…

Bogard Road

…patterns at three schools, various retaining walls, new frontage roads, preparing the subsurface for future widening, and two pedestrian underpasses. Construction was completed in two phases over three construction seasons….