Showing Results For

Conway Master Plan Development

…district including a grocer, office space, restaurants, retail, and apartments. DOWL team members led the civil design and permitting for this project. The project required vacating public easements and rerouting…

Mesa Fire Station

DOWL completed the site design of a new three-bay, 12,339-square-foot fire station in the City of Mesa, Arizona. LEED sustainable concepts and principles were incorporated into the new building to…

Mt. Pisgah Gardens

and then helped to finalize a contract with the construction contractor. During construction, overall project management and construction administration was provided. The project was completed under budget and on schedule….

BG Food Cartel

…with indoor/outdoor seating. The site can host events for up to 150 people in a clean, comfortable environment. The DOWL team developed designs for the site layout and grading, pedestrian…

Park the Carts – Food Cart Pod

This project for NJP Property, funded in part by Prosper Portland, the City of Portland’s community development corporation, involved development of schematic and final designs for an approximately half-acre food…

Tahoe-Reno Industrial Center GID Effluent System

…system included two booster pump stations (BPS). The lower BPS draws effluent from a 30-inch pipe that penetrates below the dam and sends the effluent to the 1,000,000-gallon storage tank…

Johnson Wetland Mitigation Project

The Johnson Wetland Mitigation Site will provide compensatory wetland mitigation for anticipated impacts from future transportation projects. DOWL was retained by the Montana Department of Transportation to analyze the viability…

Sheridan North / Northwest Water Projects

…route crossed a major slope stability area requiring a geotech investigation and the use of directional bored fusible PVC for stability and to avoid the possibility of pipe joint separation….

Bernhardt Creek Slide Repair

…analysis, the team selected a retaining wall as the preferred alternative because it presented the best combination of reasonable risk, constructability, cost-effectiveness, environmental and permitting options, and minimized traffic impacts….

Sweet Creek Road

…evolved into a complex 15-span bridge in order to maximize its effectiveness in preventing further landslides at the site and maintaining access. It is now the longest bridge in the…