Showing Results For

Choteau Wastewater Collection and Treatment Plant

City of Choteau hired DOWL to complete a facility plan and grant applications for improvements to their wastewater collection and treatment systems. DOWL prepared and obtained TSEP and RRGL grants…

Water you doing? Turning water into water.

Reno is ripe for tech-industry development because it has all the necessary elements for success: high-skill labor, developable land, tech infrastructure, a favorable tax climate, and a vibrant quality of…

Orcas Island Airport Master Plan

…providing current and future capacity needs. Public outreach played a significant role in the project, including Port Commission presentations, user interviews, advisory committee meetings, community presentations, and public open houses….

Sunrise Expressway

…The completed project created major interchange/intersection improvements that streamlined freeway access and significantly reduced back-ups on neighboring arterials. Now that the roadway is open, ODOT estimates that the Sunrise Expressway…

Billings 24th Street West Water Main Replacement

…Billings Public Works Department. All projects involve survey, geotechnical investigations, detailed traffic control designs, public outreach, bidding assistance, full-time construction inspection, field and laboratory material testing, staking, and quality assurance….

Nanushuk Environmental Impact Statement

DOWL developed a third-party EIS for the U.S. Army Corps of Engineers for Oil Search Alaska’s proposed Nanushuk oil development project. The project is located on the North Slope of…

Weaver Road Extension

and off of the freeway. The Weaver Road Extension solved that by adding a new curved steel girder structure in the shape of an elegant “S” which extends east from…

Fremont County School District #1 Bus Barn Parking Improvements

…Phase services for this 3.4-acre parking lot included geotechnical engineering, surveying, and parking lot design while construction phase services included administration, observation, materials testing, and construction staking. Geotechnical engineering included…

Port of Anchorage Cement Load Out Facility

…depths of 150 feet and performing two Cone Penetrometer tests to depths of 150 feet at the proposed cement dome sites at the ABI loading facility. A detailed report along…