Showing Results For
I-5: Willamette River Bridges (Whilamut Passage)
…massive project had to stay within the existing right-of-way which resulted in the reconstruction of the I-5 freeway and connector ramps within their current footprints. This required complex construction sequencing…
Peter Courtney Minto Island Bridge
…for final design, DOWL developed an iconic 305-foot-long inclined arch cable-stayed bridge, along with 6,000 feet of trail. The completed project provides Salem commuters with a car-free connection into downtown…
Design-Build Institute of America selects DOWL Murphy Corridor Improvements project for National Award of Merit
…staffers throughout the company’s other offices. “One of the founding pillars of our company charter is Innovation,” said DOWL President and CEO Stewart Osgood. “Over the last seven years we…
Donald Oregon TGM Code Update
…with the City of Donald manager, planning commission, and stakeholders throughout the code update process. An open house community event will also be held to ensure citizen awareness and input….
Tillamook County Emergency Response
…cut-off communities like Cape Meares; rescue medically vulnerable community members in Garibaldi and Twin Rocks; and maintain access to Tillamook Creamery co-op members to avoid ruin. With the aid of…
DOWL’s boomerang employees
DOWL has several “lifers” at the firm; people whose progression of professional photographs for the company seems to show that life has been lived, pies have been consumed, and gravity…
Weaver Road Extension
…and off of the freeway. The Weaver Road Extension solved that by adding a new curved steel girder structure in the shape of an elegant “S” which extends east from…
OBEC and DOWL Announce Merger
…for their transportation, inspection, survey, and environmental services in Oregon, and their bridge and marine services will form a transformative new practice area for the combined company. “OBEC and DOWL…
Tahoe-Reno Industrial Center GID Effluent System
…feet in height. Approximately 2.2 miles of piping was constructed to distribute the three sources of effluent directly to the reservoir and to the 1,000,000-gallon tank. Another component of the…
Eyak Weir Preliminary Analysis and Replacement Design
…degrading weir is classed as a fish barrier and a hazard to local recreational users. DOWL was engaged by CRWP to characterize the geomorphic, hydrologic, and hydraulic attributes of the…