Showing Results For
Test Page
Test here…
Anchorage Neighborhood Health Center
DOWL provided design and construction phase project management services for the Anchorage Neighborhood Health Center project — a $28 million project completed in 2012. Services included negotiating the final design…
Planned, managed change: the DOWL presidency
…and thorough internal search and ongoing mentoring program, Stewart said he was grateful for the transition he enjoyed when he became president in 2000. “When I took the helm, it…
Search
Upper Kobuk Mineral Projects
…to assist Trilogy Metals with permitting. A Preliminary Water Balance Study for the Arctic Deposit Site was completed which established baseline hydrologic conditions for two watersheds near the Arctic Deposit…
Salt Creek Tunnel Viaduct
…The scope of improvements for this project included completing the construction of two partially completed bridges; replacing two half viaducts with new bridge structures on each side of the tunnel;…
Big Hole River Diversion Dam and Pump Station
…the diversion dam and pump station. DOWL provided engineering and design, environmental compliance and permitting, and construction services to assist BSB in replacing the dam, intake structure, and pump station…
Queen Creek Municipal Complex
DOWL was the civil engineer of record for the new Queen Creek Municipal Complex (QCMC). The QCMC completes the development of the town’s Municipal Complex by adding a 26,000-square-foot public…
OBEC and DOWL Announce Merger
…OBEC and DOWL share similar employee-owned business models, overlapping geographies, complementary skill sets, and core values that shape their quality– and integrity-driven cultures. Together, we will bring an expanded range…
DOWL ranks in top 200 of ENR Top 500 Design Firms list for 2021
…high-quality full-service firm to our clients in the western United States, and a higher ranking on ENR’s list is indicative of our success in these efforts. See ENR’s cover story…