Showing Results For

Ridgewood View Park Reservoir

…partially buried pump station and was trusted to provide peer review and quality assurance on the irregularly shaped and buried concrete reservoir. DOWL worked closely with the geotechnical engineer on…

City-County Drain Flood Mitigation

…new 38-foot-wide, two-way flood protection/stormwater gate was installed in the existing City County Drain ditch to balance floodwater backwater while still passing high runoff flows from the City County Drain….

Northern California Youth Regional Treatment Center

…disinfection system, domestic booster pump system, and diesel-driven emergency fire pump system. The project also included completion of the full regulatory process for permitting a new public water supply in…

Ketchikan Hospital

…of contact for the City (owner) and PeaceHealth (operator). Construction administration responsibilities included managing the architecture, engineering, and commissioning resources during construction, as well as administering the CM/GC construction contract…

Farr West becomes DOWL

…still here to serve you. DOWL and Farr West share similar employee-owned business models, complementary skill sets, and mission and values that shape their qualityand integrity-driven cultures. Together, we…

Warm Springs Creek Emergency Bridge Replacement

During severe flooding, significant erosion occurred behind the bridge wingwalls resulting in the road closure of Highway 191. Highway 191 is an important transportation corridor serving the rural communities of…