…option for any of the project components. Ultimately, it was determined that full reconstruction was necessary. In many locations, the existing water line was comprised of ductile iron pipe while…

Port of Siuslaw Floating Dock

…deficient dock system that included a new commercial dock and public dock as well as a diagonal connection between the two. Environmental permitting was complicated when, after the construction contract…

Choteau Wastewater Collection and Treatment Plant

and SRF loan funds for completion of recommended Phase 1 Collection and Treatment System Improvements completed in 2010 including slip-lining of 2,800 lineal feet of sewer main, replacement of leaking…

Working from home: Strategies for success

During this unprecedented time, more people are working from home than ever before. For some of us, this change has come quite suddenly, and it can be an unfamiliar challenge…

Virginia City Sewer Project

DOWL began working on preliminary studies, engineering reports, and designs for this project in 2009. The design and environmental assessment were completed in 2012 and submitted to Nevada Division of…

Witch Hazel Village South Concept Plan

…on River Road in Washington County, Oregon. DOWL’s team prepared the preliminary master plan, led early discussions with key agency and departmental staff, completed the infrastructure studies, and developed the…

Glenn/Muldoon Interchange

…engineering, and foundation design. Bid-ready plans were completed in August 2015, less than 30 months from when the project was initiated. Construction started spring 2016 and completed in fall 2018….

Main Street Reconstruction, 2nd to 5th Street

DOWL provided multi-phase design services for the reconstruction of Juneau, Alaska’s Main Street. In addition to all the typical utility components (water, sewer, storm) of a city street reconstruction, the…