Showing Results For
Robert Léger joins DOWL’s civil group
Robert Léger (pronounced Leh-Shey) is a key hire senior civil engineer in DOWL’s Portland office. He comes to DOWL with the right kind of experience—over 20 years of large and…
Vee Quiva Casino and Resort
…to safely route significant off-site drainage around the development, as well as water and sewer extensions to serve the site. The entry road to the resort was extended approximately 2,500…
Cedar Hills Crossing
Cedar Hills Crossing is a large retail commercial center located in Beaverton, Oregon. The center totals over 55 acres of commercial space including grocery anchors, retail shops, restaurants, fitness center,…
Goat Blocks Development
The Goat Blocks project is a multi-block, mixed-use development in Portland’s vibrant inner southeast core. DOWL team members led the civil design and permitting from concept to completion for this…
The Cove Garden Apartments
The Cove Garden Apartments project is located in Oregon City, Oregon and includes approximately 240 units in 11 buildings along with pool and fitness amenities and a small retail component….
Washoe County Safe Campus
…a security building. Washoe Safe Camp went through several iterations with the input of the Washoe County Human Services agency. In late September, when the design was nearing completion, the…
People Who Make it Happen
Fox Ridge Master Plan/Gillette Regional Level II Study
This was a Level II feasibility study of the water system for the Fox Ridge District near Gillette and was funded by the Wyoming Water Development Commission (WWDC). The study…
South Franklin Street Reconstruction
…historical district, northwest art, and no impact to parking. The first two phases of construction replaced aging sidewalks built on top of business basements; a common occurrence when the city…
Southeast Interceptor, Segments 4&5R, 2S&3, Phase I Extension
The Southeast Interceptor project is a new deep gravity sewer in southeast Bend, increasing system capacity and connecting previously unserved areas. Completion of the project has allowed subsequent projects to…